Description
Made-to-order metal lamp shades and housings in stainless steel and hollow-out iron. SKU CQ-OC-001 is produced at our Shenzhen factory for wholesalers, distributors, importers and private-label programmes, shipped to the a factory-configured design for CQ-OC-001 specification as standard.
Why buyers choose the CQ-OC-001
- OEM/ODM manufacture to your drawing, sample or 3D file
- Stainless steel, carbon steel and hollow-out iron construction
- Finishes: brushed, mirror polish, powder coat, gold/silver plating
- Tooling developed in-house — typical lead time 25-35 days
- Also supplied as complete lamp assemblies for table and wall lights
Technical specification
| Material | Stainless steel / iron |
|---|---|
| MOQ | 200 pcs per design |
| Process | Stamping, laser cutting, polishing, plating |
| Lead Time | 25-35 days after sample approval |
| Customisation | Size, thickness, finish, logo |
| Packing | Bulk or retail-ready |
Wholesale pricing & MOQ
All CQ-OC-001 figures below are ex-works Shenzhen, USD, and the tier is applied automatically at cart level. Buyers ordering CQ-OC-001 beside other OEM Lamp Components products can have the goods consolidated into one shipment.
| Order quantity | Unit price |
|---|---|
| 50–199 pcs | US$6.24 |
| 200–499 pcs | US$5.46 |
| 500–1,999 pcs | US$4.88 |
| 2,000– pcs | US$4.36 |
50 pcs per SKU is the standard MOQ for CQ-OC-001. Samples of CQ-OC-001 from 5 pcs are ordered on the sample order page; ask for a lower threshold or a mixed container for CQ-OC-001 via request a quote.
Customisation & OEM options
OEM work around CQ-OC-001 covers logo printing on the product and retail carton and private-label manuals and packaging inserts. Tooling-free changes on CQ-OC-001 start at 200 pcs; moulded changes typically run from 1,000 pcs with a 25–35 day lead time. The step-by-step route for CQ-OC-001 is set out on our OEM / ODM customisation page.
Quality, compliance & shipping
Each production batch of CQ-OC-001 is lighting tested in full prior to packing. For CQ-OC-001 orders, CE, RoHS and FCC documentation is available on request, and units ship with UN38.3 battery test reports for air freight. Lead time for CQ-OC-001 is 7–15 days on stock; forwarding quotations by sea, air or express come with the order confirmation.
Where this product fits
OEM/ODM manufacture to your drawing, sample or 3D file. The model is part of our OEM Lamp Components range, specified as a factory-configured design for CQ-OC-001: 50 pcs minimum, samples sent worldwide, OEM / ODM available.









